The original scope included a grinding circuit consisting of two AG mills and a secondary pebble mill, with successive copper and nickel flotation to produce two separate concentrates. However, according to Kevitsa's Chief Metallurgist, Ishmael Muzinda, some 12% of the copper could not be recovered in the copper flotation stage due to poor liberation and graderecovery limitations.